Cannon construction: Difference between revisions
Jump to navigation
Jump to search
links, thinwall |
No edit summary |
||
| Line 4: | Line 4: | ||
* Solvent welding [http://www.burntlatke.com/weld.html correctly] | * Solvent welding [http://www.burntlatke.com/weld.html correctly] | ||
* Using pipe of the proper pressure rating, eg. sch 80 in a [[Hybrid Cannon]]. | * Using pipe of the proper pressure rating, eg. sch 80 in a [[Hybrid Cannon]]. | ||
* Only [[tapping]] (for bolts, pressure gauges) though a double layer of pipe. | |||
Under no circumstances WHAT SO EVER should you use [[cell-core]] or unsleeved thinwall pipe. | Under no circumstances WHAT SO EVER should you use [[cell-core]] or unsleeved thinwall pipe. | ||
Revision as of 14:23, 18 October 2005
It is important to construct your launchers with care. This includes:
- Using pressure rated (NSF-PW or NSF-61) fittings and pipe, especialy in a Pneumatic Cannon.
- Solvent welding correctly
- Using pipe of the proper pressure rating, eg. sch 80 in a Hybrid Cannon.
- Only tapping (for bolts, pressure gauges) though a double layer of pipe.
Under no circumstances WHAT SO EVER should you use cell-core or unsleeved thinwall pipe.