Cannon construction: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m Cannon Construction moved to Cannon construction |
(No difference)
| |
Revision as of 05:28, 24 October 2005
It is important to construct your launchers with care. This includes:
- Using pressure rated (NSF-PW or NSF-61) fittings and pipe, especialy in a pneumatic cannon.
- Solvent welding correctly
- Using pipe of the proper pressure rating, eg. sch 80 in a Hybrid Cannon.
- Only tap though a double layer of pipe where the pipe and a fitting is joined(for bolts, pressure gauges) .
Under no circumstances WHAT SO EVER should you use cell-core or unsleeved thinwall pipe.