Still thinking of selling pumps..

Cannons powered by pneumatic pressure (compressed gas) using a valve or other release.
User avatar
Mitchza89
Sergeant
Sergeant
Posts: 1056
Joined: Tue Jan 09, 2007 12:05 am

Hi guys,

I'm gonna get the materials for a high pressure pump tomorrow. This is going to be all epoxied brass and copper with a polished finish. If this thing turns out as good as I hope it will and I'm confident it won't break or cause problems, I'm going to sell it. If I get a buyer that is further then they are able to pick it up or me drop it off, I'll post it dismantled with instructions on how to assemble. Australia only though. Everything should just screw together anyway. To keep costs as low as possible I won't be adding a gauge to it.

I'll be sure to post it when I get it going. If you think you may be interested, by all means give me a post!

Thanks all!
Image
User avatar
jmadden91
Specialist 2
Specialist 2
Posts: 246
Joined: Thu May 07, 2009 6:03 pm
Location: Queensland, Australia

Got a rough estimate mate? I would probably consider it for when I cant use the fridge compressor. Would be a good way to get my head around them so I can knock up my own next time
User avatar
Mitchza89
Sergeant
Sergeant
Posts: 1056
Joined: Tue Jan 09, 2007 12:05 am

I'm not too sure but maybe 50 or 60. I'll give everything a good price hunt tomorrow. Of course there will be mates rates! :D
Image
User avatar
jmadden91
Specialist 2
Specialist 2
Posts: 246
Joined: Thu May 07, 2009 6:03 pm
Location: Queensland, Australia

haha love it. Hm so thats without the gauge? Considering I have got 80% of the parts already I should probably save my money. Would you consider selling parts? Say a piston for one that will fit in 3/4" Copper?
User avatar
Mitchza89
Sergeant
Sergeant
Posts: 1056
Joined: Tue Jan 09, 2007 12:05 am

I'd be more then happy to make the piston and check valve assembly for ya mate. Just give me a rough diagram on the set up you want and the layout of the pump and we should be good to go!
Image
User avatar
pizlo
Corporal 3
Corporal 3
Posts: 783
Joined: Fri Dec 22, 2006 7:27 pm
Contact:

If you have the guts a two stage pump like one member made would be an awesome next step, pity for me though being here in america!
User avatar
Northir
Specialist
Specialist
Posts: 123
Joined: Sun Sep 06, 2009 3:04 am

id be willing to pay for a high pressure pump, and id be willing to pay to have it shipped, as well as piston valve assemblys, im in the US :(
User avatar
Mitchza89
Sergeant
Sergeant
Posts: 1056
Joined: Tue Jan 09, 2007 12:05 am

I reckon I may just come up with a very in depth guide to making a pump as Geppito did. I'll keep you posted guys!
Image
User avatar
Northir
Specialist
Specialist
Posts: 123
Joined: Sun Sep 06, 2009 3:04 am

sounds awesome, would be nice to get a good guide for a high PSI pump, all though im still tryin to wrap my head around the piston valve thing
User avatar
Technician1002
Captain
Captain
Posts: 5189
Joined: Sat Apr 04, 2009 11:10 am

Northir wrote:sounds awesome, would be nice to get a good guide for a high PSI pump, all though im still tryin to wrap my head around the piston valve thing
Good luck with the understanding of how piston valves work. The thing to remember is there is no magic. It is a cylinder with two ends. Pressure pushes on both ends in a type of tug of war. When force on one end is greater than the force on the other end it moves in that direction until it can move no more.

When closed the pilot end has lots of pressure on a large area holding it closed.

On the other end is an area inside the barrel with no force because there is no pressure. There is another area exposed to the chamber pressure, but it is a small area, so the total force of pressure times area is less than the force in the pilot, so it remains tightly closed.

When fired the pilot pressure is released. The force on that side is reduced. The force in the chamber area is now able to win the tug of war and the piston starts to move. As it does, the chamber air is now able to push on the area that was exposed to the barrel. As this area now has pressure the force on the front side of the piston becomes great and the piston gets a huge push open, so they tend to open very quickly.

Without all the bends and sharp edges going through a sprinkler valve, when open they flow very well.

Due to the sudden rise in force opening a piston, they are much faster than you could possibly open a ball valve by hand. This is why they are the fastest most powerful valve most spudders can build.

Common mistakes building piston valves include having too large of leakage between the chamber area and pilot area, so the pilot can't be vented fast enough do drop the pilot pressure far enough to unbalance it. The chamber simply vents out the pilot trigger.

Not using enough bumper material. When the piston moves, it does it with high speed and force, often breaking the valve.

Not getting a good piston seal, air leaks out the barrel and you can't fill the spudgun.

For these reasons building a working piston valve is a real achievement. Many build, some work, some don't, some break. I've built all types.
Post Reply

Create an account or sign in to join the discussion

You need to be a member in order to post a reply

Create an account

Not a member? register to join our community
Members can start their own topics & subscribe to topics
It’s free and only takes a minute

Register

Sign in

  • Similar Topics
    Replies
    Views
    Last post