Propane meter
I was gathering the parts for a propane meter but my local lowes does not have any 1/4in nipples in stock which i need to connect the meter to the combustion chamber. Can i use a 1/2 in. street elbow with a 1/2 in. nipple instead? the 1/2 in elbow will be screwed onto the chamber
Why not?
Note:
If the 1/2" pipe is part of the metering volume, realize that the pipe will need to be 4 times as short as a 1/4" pipe.
Note:
If the 1/2" pipe is part of the metering volume, realize that the pipe will need to be 4 times as short as a 1/4" pipe.
The problem I've run into with using a threaded street elbow is that these threads can very easily be screwed into the PVC too far. With a nipple and elbow, the threads have a resting spot, which is up against the elbow, and tends to seal better. I would stay away from placing the street elbow into the chamber and just go with a regular elbow and nipple.
Just remember the volume differences as psycix suggested.
Just remember the volume differences as psycix suggested.
Create an account or sign in to join the discussion
You need to be a member in order to post a reply
Create an account
Not a member? register to join our community
Members can start their own topics & subscribe to topics
It’s free and only takes a minute
Sign in
-
- Similar Topics
- Replies
- Views
- Last post
-
- 10 Replies
- 3072 Views
-
Last post by frozenplum4
-
- 3 Replies
- 2271 Views
-
Last post by spudshot
-
- 2 Replies
- 1466 Views
-
Last post by jitup
-
- 5 Replies
- 4072 Views
-
Last post by frogy
-
- 20 Replies
- 7249 Views
-
Last post by psycix



